Overview
The development involved the refurbishment of two vacant office buildings in the West End of Glasgow, located 300 mtrs apart and which are operated as one asset.
Clifton House comprises 213 bedrooms (142 ensuite cluster rooms and 71 studios) and Stewart House comprises 51 self-contained studio units.
Our Work
We installed the mastic sealant to the perimeter of all the windows here for CMS Windows. This also entailed the installation of sealant to all Glass to Glass joints and the structural bonding of Metal Technology concealed vents through our sister company Structural Bonding Solutions